Work on the Center for Digital Scholarship and Data Visualization has picked up in recent weeks after some delays caused by structural issues with the sidewalk at 34th Street and 5th avenue, which has involved coordination with the municipal government and the condo of which the GC is a part. But work is now progressing and walls in the space are starting to go up.

Students working in the library while construction is ongoing can request free noise-blocking earplugs at the Circulation Desk or Reference Desk.

Please find some photos below of what the space looks like today:

Photo of GC concourse level under construction. Photo shows sheetrock going up over metal framing, with contractor equipment over a dirty floor and HVAC duct work and hanging wires above
Construction photo taken on November 9, 2021
Photo of GC concourse level hallway under construction. Photo shows sheetrock panels next to metal framing over a dirty floor. HVAC duct work and hanging wires hang from the ceiling above
Construction photo taken on November 9, 2021
Photo of GC concourse level interior space under construction. Photo shows sheetrock panels next to metal framing over a dirty floor. HVAC duct work and wires hang from the ceiling above
Construction photo taken on November 9, 2021